On 27th November 2018, the engines of OOS Serooskerke were started. The OOS Serooskerke is being built in China Merchants Heavy Industries (Jiangsu). The vessel building contract is effective since 5th August 2016. After 10 months of engineering, the steel was cut on 28th June 2017.