Kudos to CMHI and Huisman for making the following happen:
Our factory tested 2200mt Offshore Mast Crane with reeved crane wires was installed on the OOS Walcheren in a single lift using 3000mt dual hook floating crane. A perfectly engineered lift. Well done team!